Chamber Double Incinerator

Chamber Double Incinerator:

Burning Rate      10 kg per hour (for two incinerators)

Burning Rate     20 kg per hour (for three incinerators)

Loading   Method   Manual

No of Burners   Single for 10 kg/hour and Double for 20 kg per hour

Fuel                    Diesel and Natural Gas

Warm Up Time    Not more than 20 minutes

Temperature controller   Digital

Power Supply      Single Phase 220V

Chimney Height    20 feet from ground level

Wet and Dry Scrubbers   Optional

 

Gasified incineration for burning medical wastes

Gasified incineration for burning medical

wastes.

 

Fuel type: Natural Gas

Burning Capability:

–   30-50 kg/time

–   Daily 3-6 times

 

Incinerator size: max 2000x1200x3200 mm

Burning room volume:

–   Gasification room max 0.7 m3,

–   Secondary burning room max 0.5 m3,

 

Size of the filling entrance: max 650×850 mm

Air blower: max 0,5 kW

Combustion-support combustion machines:

–   Power max 0,2 kW

 

Re-burning machine: Power max 0,2 kW Voltage: 220V / 380V

Weight: max 5000 kg

User Manual Language: English

Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant.

 

Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant.

Requirements:

  1. Incinerator system complete with scrubber, pollution control system, water system, loading system, ash removing system and if anything more option is available. we have to burn 10000kgs/day, We work 8 hours a day, so your incinerator should have capacity to burn atleast 1400 or 1500kg/hr of waste.

 

supply 02 primary combustion chamber, and continuation feeding or alternately. each primary combustion volume is 4.0 M3, total 8 m3.

  1. With complete system specification, power, water fuel requirements.

 

  1. Space requirements & floor plan

 

  1. Pre-installation requirements. Space, power, water, drainage system etc

 

  1. Fuel type” diesel or gas?

 

  1. All options available.

 

  1. You have to send your technical team for installation, user training, maintenance training for end user technicians.

 

  1. Maintenance schedule—what has to be done, daily, weekly, quarterly, half yearly, annually.

 

  1. What are the replacement items during one year.

 

  1. Your system should meet all local & international standards with respect to handle of tobacco dust before feeding to incinerator, gas emission, waste water discharge to public drain system, ass disposal etc.

 

  1. End used will send this dust to incinerator plant in bags of 300kg each, so we are expecting 35 bags of 300kg each per day, 7 days a week.

 

 

  1. How many engineers or technicians you will send for installation, how many people, what machines & tools you want us to mobilize to facilitate your people to do the installation. how many days installation & training will take.

 

 

  1. What will be your charges for installation visit.

 

 

  1. If you have some picture of such big installations, references(within this region is helpful if you have), you can provide us.

 

 

 

 

 

CLOVER Containerized Incinerator

Technical Specifications

  1. Pre-assembled, containerized type

—yes, do not included chimney installation.

 

  1. Burning rate: 100 – 120kg / hour

—yes

 

  1. Minimum operating temperature: 8500c (Primary combustion)

—800-1000 degree

 

  1. Maximum operating temperature: 14500c (afterburner chamber)

—1000-1200 degree

 

  1. Secondary Burning capacity: Compulsory.

—yes

 

  1. Density insulation: 20 mm high

—50mm

 

  1. Refractory casting: minimum 65mm

—110mm

 

  1. Heavy duty refracting lining to withstand 15000c

—1450 degree

 

  1. Average burn out time: maximum 3.0 hrs

—yes

 

  1. Fuel type: fuel oil (diesel)

—yes

 

  1. Fuel consumption in L/hr: 7.5 to 9

—average 16.6liter/Hr.

 

  1. Residency time in secondary chamber: 2 secs.

—yes

 

  1. Residue ash post 100kg Max 3.8 kg

—yes

 

  1. Installation period Maximum 7days.

—yes

specification of Incinerator 20 kg/hr

Capacity UPTO 20 kg/hr
Size: 940 x860x2700 mm
Material: STAINLESS STEEL STACK, REFRACTORY CONCRETE LINING SPECIAL INSULATION MATERIAL
With burner: 15 – 20 KW
Temperature: PRIMARY CHAMBER = 800°C AND SECONDARY CHAMBER = 850 – 1200° C
Sufficient heat generation for secure and complete combustion 600-800 °C in the first chamber and >1000 °C in the second chamber
Easy transportation on standard EURO-pallets
Constructed in a modular fashion easy on-site movement and assembly with a minimum of equipment and technical skills;
For the destruction of problematic waste like sharps, amputates and body parts, wet or moist matter;
Off-gas quality: moderate smoke emissions during one quarter of the total incineration time; no visible emission during three quarters. AS PER INTERNATIONAL STANDARDS
The remaining ash approximately 5-10% in weight and below 1% in volume of the original waste AS PER INTERNATIONAL STANDARDS
Chimney height at least 5 m above the incinerator 5m ABOVE FROM THE GROUND
Temperature resistance of the lining at least 1,200 °C

Incinérateur

Carburant Diesel
Capacité (M3) 1.18
Ave Capacity 750 kg
Consommation (l/h) 6
Dimension externes
Longueur (mm) 3110
Largeur (mm) 1800
Hauteur (mm) 3300
Ouverture Porte 770×2000
Dimension internes
Longueur (mm) 2100
Largeur (mm) 700
Hauteur (mm) 800
Opération
Minimum température d’opération 950
Maximum température d’opération 1320
Température de suivi oui
Thermostat oui
Ventilateur oui
Chambre de combustion secondaire secs
garantie minimum 12 mois

Incinérateurs

Carburant Diesel
Capacité (M3) 1.92
Ave Capacity 1200kg
Consommation (litre/heure 12
Dimension externes
Longueur (mm) 3110
Largeur (mm) 2150
Hauteur (mm) 3200
Ouverture Porte 1000×2000
Dimension internes
Longueur (mm) 2200
Largeur (mm) 1050
Hauteur (mm) 800
Opération
Minimum température d’opération 950
Maximum température d’opération 1320
Température de suivi oui
Thermostat oui
Ventilateur oui
Chambre de combustion secondaire 2 secs
garantie minimum 12 mois

TECHNICAL SPECIFICATION FOR MEDICAL WASTE INCINERATOR (50 – 60kg/hr)

COMPLIANCE (YES, NO or COMMENT)
Item

Description

Medical Waste Incinerator, 50 to 60

Kg/hr

Item Quantity 5 No.
Support Health Sector Support Project
Point of Installation (Hospitals) Moi Voi, Makindu, Maragua, Eldama Ravine and Isiolo District Hospitals
1.     General Description

Supply, delivery, installation and commissioning of a medical waste incinerator suitable for disposal of Medical, General and Pathological waste in a safe and clean environment. The unit shall consist of two chambers and operate on the principal of controlled air and temperature. The unit shall consist a particulate remover (scrubbers) as stipulated in waste management regulations, 2006 (Legal notice NO. 121 of 29th September, 2006). The Unit shall be fully automatic and controlled by an automatic electronic controlled system except loading system which shall be manual.   The unit shall be capable of incinerating between 50 to 60 kg of solid medical waste per hour. It shall be constructed from mild or aluminized steel lined with refractory material.

 
2.   Composition

2.1     Main unit

2.2   Accessories

 
3.   Performance specifications  
3.1 Main unit    
3.1.1 Application For incineration, general and pathological
3.1.2 Capacity 50 – 60 kg/h burn rate
3.1.3

 

Type Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
3.1.4 Operating time Minimum 8 hours daily
3.1.5 Operating temperature From 850 0C to 1200 0C, Automatic controlled
3.1.6 Residual Ash 5 to 10%
   3.2       Primary Chamber
3.2.1

 

Construction Constructed from heavy duty mild or aluminized steel Or

equal and approved equivalent

3.2.2

 

Insulation material Refractory material lining similar or equal to calcium

Silicate and hot face combination of heavy duty brickwork

3.2.3

 

Internal Construction Fixed hearth type complete with gratings, concave bottom

and charging door, lined with refractory material

3.2.4

 

Charging Door Suitable for manual loading of wastes and with smooth

Dear seal equivalent of Ceramic seals with hinges.

3.2.5 Door Lock Automatic, Electric type
3.2.6

 

Ash removal door Provided, for removing resultant bottom ash leftovers                             from the Primary chamber
3.2.7 Gratings Provided
3.2.8 Loading Manual loading of waste
3.2.9

 

Primary Burner Fully automatic, with fuel, temperature and speed controls with ignition system, flame detector, Air fan complete with safety features, flame failure, Diesel fired fuel injector type and Flange mounted
3.2.10

 

Blower Provided. For supplying excess combustion air through the distribution system with speed control system
3.2.11 Temperature Minimum exit 850 0C
3.2.12 Observation port To be provided with protective glass type
3.3       Secondary chamber
3.3.1

 

Construction Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
3.3.2

 

Insulation Refractory material lining
3.3.3

 

Combustion Temperatures Above 850 0C, controlled electronically
3.3.4

 

Gas residue or retention Time > 2 second at minimum 850 0C  
3.3.5

 

Secondary Burner Provided, Diesel fired, fully automatic, with fuel, temperature and speed controls, With ignition system,                                                                   Flame detector, Air fan, Complete with safety features, flame failure Diesel fired fuel injector type.                                                                   Flange mounted
3.3.6 Ejector Provided, Venturi type, for cooling the flue gases
3.3.7

 

Combustion Air Fan Provided for supplying combustion and creating a negative drift and turbulences
3.3.8 Temperature Maximum 1600 0C
   3.4       Chimney
3.4.1

 

Construction Constructed from heavy duty mild or aluminized steel   or equal and approved equivalent                                                                   Refractory material lining
3.4.2 Length 10 m above ground
3.4.3 Bore about 350mm diameter
3.4.5 Discharge temperatures About 850 0C
3.4.6 Emissions To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
   3.5         Electrical System
3.3.5

 

Control unit Fully automatic with microprocessor based control                                                                       unit (PLC) automating all operations of the                                                                       incinerator. Capable of monitoring all incinerator parameters With large LCD or similar for display of all progress

Parameters i.e. temperature of primary and secondary chambers, turbulence and time

With status lamp

With user of defined and differed programmed operating cycles for different type of loads/conditions

With safety interlocks, display of errors and visible and audio alarms.

System for continuous emission monitoring

3.5.2

 

Isolator switch Supply and install isolator switch 240V, 100A for the                                                                     incinerator unit, including all necessary cables 10m
3.5.3

 

Distribution Board Supply and install distribution board. 100 A, complete with MCBs suitable for the rating of the incinerator unit and associated equipment. Wiring     to be done according IEE regulations.
3.5.4

 

Wiring Make provisions for wiring the isolator switch, Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.                                                                         Working length 20m. Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
3.6     Fuel System Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
3.6.1

 

Fuel Tank Tank capacity, 400 liters, constructed from preferable suitable metallic material or high temperature resistance material
Fuel type Diesel
3.6.2

 

Fuel Lines Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.

Working length , 20m

Fuel pipe material; Special copper pipes or similar                                                                         and approved materials

4               Physical characteristics  
4.1 Main unit Floor mounted, stand alone, fixed hearth type
Dimensions About 1.2 x 2.2m (WxD)
5   Operating environment    
5.1 Power Requirements 240V,A/C 50Hz, single phase, with PE
Ambient temperature 10 0C to 40 0C
Relatively humidity 40% to 90%
6. Accessories  
Rack, 2 m long 1 piece
6.1 Waste cart, stainless steel 1 piece
7 Spare parts
7.1 Burner 1 set
7.2 Fuel Filters 6 sets
7.3

 

All other spare parts                     required for replacement during and after 12 months of operations. 2 pieces of each
8               Quality Standards  
8.2

 

Manufacturing standards NEMA Kenya Act, 1999

Legal Notice No.121 of 29th September 1999 on waste Management Regulations

EU waste incinerator Directive- EC 76/2000

BS 3316

WHO Emission Standards

World Bank Emission Standards

or any other internationally recognized standards

Conformity to standards CE marked or any other internationally recognized documents
9         Local back up service
9.1 Available Should be available locally
9.2 Capacity to service equipment Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance   service and spare parts sales for the lifespan of the incinerator
10         Delivery point  
10.1 KEMSA For inspection and verification
10.2

 

Moi Voi, Makindu

Maragua, Eldama Ravine and Isiolo Hospitals

For installation, testing, NEMA Certification and commissioning
11 Pre installation works

 

Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
12 Installation and testing Complete installation and set up of the incinerator at designated as per manufacturer’s instructions

Provide fuel and test run the incinerator for 3 hours daily for 7 days

13          Training  
13.1

 

User training On site user training on operation and daily up keep
13.2

 

Maintenance training On-site maintenance training on Preventive Maintenance, repair and trouble shooting
14 Technical Documentations  
14.1 User manuals 2 sets
14.2 Service manuals 2 sets
14.3 Drawings 2 sets
15         Commissioning  
15.1 Testing and Commissioning of the machine to the satisfaction of the user
16 Warranty
16.1 Equipment Minimum of one year after commissioning on all parts.
16.2 Equipment system Nil
17.   Maintenance contract